| Issue: | Inflow and infiltration issues. Link information gathered to existing GIS |
| Result: | Multi-year SSES program; Data collected resulted in a three to five year rehabilitation program to limit inflow and infiltration in Phase III; Inspection data provided the City with information to prioritize corrective measures; GPS mapping provided for southwest basin. |
| Services provided: | 2000: 2500 manhole inspections, 1,000,000 LF of small diameter interceptor lines cleaned and CCTV'; 2001: 176,000 LF CCTV, smoke testing, determination of GPS points, and 900 manhole inspections. |