| Issue: | Inflow and infiltration issues. Provide data to determine rehabilitation needs. |
| Result: | Multi-year SSES program; Data collected resulted in a three to five year rehabilitation program to limit inflow and infiltration in Phase III; Inspection data provided the City with information to prioritize corrective measures; GPS mapping provided for southwest basin. |
| Services provided: | 2000: 2500 manhole inspections; 1,000,000 LF of small diameter interceptor lines cleaned and CCTV.\n\n2001: 176,000 LF CCTV, smoke testing, and determination of GPS points; 900 manhole inspections. |