| Issue: | Identify areas for future repairs and/or replacement in existing storm drains. |
| Result: | Long-term rehabilitation and maintenance plans were built upon data collected. |
| Services provided: | 8000 LF of storm drain (12" to 42" diameter); Light and heavy cleaning, CCTV; Light cleaning of manholes and catch basins; 100 lateral inspections. |