West Palm Beach, FL (2003)

Issue: Identify areas for future repairs and/or replacement in existing storm drains.
Result: Long-term rehabilitation and maintenance plans were built upon data collected.
Services provided: 8000 LF of storm drain (12" to 42" diameter); Light and heavy cleaning, CCTV; Light cleaning of manholes and catch basins; 100 lateral inspections.